The manufacturer wishes to set up a control chart at the final inspection station for a gas water heater. Defects


The manufacturer wishes to set up a control chart at the final inspection station for a gas water heater. Defects in workmanship and visual quality features are checked in this inspection. For the past 22 working days, 176 wate rheaters were inspected and a total of 924 nonconformities were reported. a) What type of control chart would you reccommend here


Leave a Reply

Your email address will not be published.